Skip to content

Landing spot for summarizer input descriptions #365

Description

@marcverhagen

There are some notes in the inspector repository on the input to the summarizer at https://github.com/clamsproject/mmif-inspector/blob/main/docs/developer-notes.md.

Since that repository is not about the summarizer anymore I want to move them and I am collecting candidates for landing spots. I see two candidates in this repository:

  • a new docs directory inside the summarizer package
  • the mmif-python documentation.

Any other candidates?

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    Status
    Todo

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions